Unit 21 – L/618/8101 Geotechnical Design Assignment 1: Scunthorpe Station Overpass & Bridge Infrastructure Proposal
Unit 21 – L/618/8101 Assignment 1 Scenario Brief
1.0 Client Brief
North Lincolnshire County Council (NLCC) is seeking to develop a coherent and deliverable transport package for he Scunthorpe train station area(see Zone 4-Preference Project). NLCC is soliciting help to design the project to:
- improve traffic flow around the train station. Specifically, the Station Road/ Church Lane intersection with Oswalds Road
- Provide access for proposed future developments of commercial and residential properties
- Better access to the proposed redevelopment of the expanded Scunthorpe train station to increase passenger volumes.
cta_question_1
2.0 Scenario
Prepare design proposal for the elevation of the Oswald Road approach to Station Road/Church Lane intersection (see Figure 4-Reference Project) joining Howdens Hill dual carriage road involving the following:
- Design and Replacement of bridge spanning over the Scunthorpe station Rail line linking to Ashby Road
- Design of new approaches to integrate overpass
- Pedestrian access around the new overpass providing access.
3.0 Geotechnical Assessment- Part 1
Present an overview with reference to project site of:
- rock types, their formation and uses in civil engineering and building projects
- cogent description and classification of soils using current codes of practice
- different types of analysis used to measure soil properties and the analysis soil properties
4.0 Design Proposal – Part 2
The proposal should cover the following:
- Geotechnical weaknesses and issues the given site
- Design proposals to address geotechnical problems with justification
- Prepare presentation of design proposal for technical team
cta_question_2
The post Unit 21 – L/618/8101 Geotechnical Design Assignment 1: Scunthorpe Station Overpass & Bridge Infrastructure Proposal appeared first on Diploma Assignment Help UK.